For any inquiries, questions or commendations, please call: +61 7 3813 7170 or fill out the following form
List of Projects
Project | Customer | Products | Completion |
---|---|---|---|
Golden Pass LNG | CCZJV | 1 of 440m3 @ 17bar Ethylene Bullet | Feb 2022 |
LNG Road Tankers | Wesfarmers LNG PTY LTD (Kwinana, WA) | 4 off 55,000L @ 8bar LNG Road Tankers | Oct 2018 |
LNG Road Tankers | Wesfarmers LNG PTY LTD (Kwinana, WA) | 2 off 55,000L @ 8bar LNG Road Tankers | Jun 2018 |
CO2 Tank | Stanbroke | 1 off 50,000L @ 22bar Vertical CO2 Storage Tank. 1 off Ambient Air Vaporizers (AAV). | Jan 2017 |
Freeport LNG | CCZJV | Vacuum Jacketed Piping for Freeport Liquefaction Train 3 | 2016-2017 |
SF6 Recovery System | ABB | Triple Layered Cryogenic Tank with Internal Heat Exchanger and Storage Tank | 2016 |
Cameron LNG | CCJV | Vacuum Jacketed Piping for LNG Plant | 2015-2017 |
Freeport LNG | CZJV | Vacuum Jacketed Piping and Field Joint Installation for LNG Plant | 2015-2017 |
Scarborough FLNG FEED | NK (Korea) / Hyundai | FEED – Engineering consultation and design development of LNG refrigerant storage systems for Floating LNG. 4 x 1,250m3 IGC Type C. | 2015-2016 |
LNG Regas Plant (EPC) Stage 1 | Myanmar / Thailand | LNG Receiving Terminal and Regasification Plant, including VIP (from FSU), storage tanks, vaporizers, pumps, plant control systems and gas send-out to power plants. Stage 1(35mmscfd). 4 stages total. | 2015-2017 |
Cameron | CB&I / Chiyoda | 2 x 330m3 Ethylene Bullets – LNG Refrigerants | Est. Feb 2016 |
Mini LNG Plant (EPC) Stage 1 | Mineral Resources (Australia) | 15 TPD LNG – Western Australia 7 x 60 m3 LNG storage tanks, 50m3 Road Tanker, 1 mmscfd Ambient Air Vaporizers (AAV), Control and Process System – EPC. |
Oct 2014 – Mid 2015 |
APLNG | Bechtel / ConocoPhilips | Ethylene ISO Containers (28 off). | Dec 2015 |
CO2 Tanks | BOC | 4 off 475,000L @ 22 bar, Horizontal. | Dec 2014 |
GLNG | Bechtel / Santos | Ethylene ISO Containers (56 off). | Oct 2014 |
DLNG | ConocoPhilips / Worley Parsons | Vacuum Insulated Piping, Modification during shutdown. | Sep 2014 |
APLNG | Bechtel | Customer pipe spool modification. | Mar 2014 |
GLNG | Bechtel / Santos | Ethylene Storage Tanks (3 x 280kL). | Jun 2013 |
Road Tanker LOX | Air Liquide | Tri-axle Type, Custom-Design. Air Gas Road Tankers. | Jun 2013 |
APLNG | Bechtel / ConocoPhilips | Vacuum Insulated Piping, 8” to 60” dia. Core Pipes, 4km for LNG plants. | Aug 2013 |
APLNG | Bechtel / ConocoPhilips | Ethylene Storage Tanks (2 x 288kL) | Sept 2013 |
QCLNG | Bechtel / BG | Vacuum Insulated Piping, 6” to 48” diameter core pipes, 4km for LNG plants. | Dec 2012 |
QCLNG | Bechtel / BG | Ethylene Storage Tanks (4 x 285kL), ASME-U Stamp. | Dec 2011 |
Road Tankers LNG | Wesfarmer/Kleenheat | Tri-axle type, 45kL LNG Custom-Design | Dec 2011 |
Methane Hydrate Experimental Rig Design | ANSTO / CSIRO Sponsored by Exxon & Woodside | Closed-loop Methane Gas Circulation System at 20MPa. Featuring Water Injection for Methane Hydrate Forming Experiment Using Neutron Scattering (From Nuclear Reactor). | Jun 2010 |
Nuclear Liquid Waste Storage | Australian Nuclear Science & Technology Organisation. (ANSTO) | 4 off 7,000L Tanks for Mo-99 Radioactive Liquid Waste Storage Tanks. 1 off Vacuum Tank | May 2010 |
Design Verification | CSIRO | 200kW Solar Energy Process Equipment | May 2010 |
SF6 Recovery System – R&D | ABB | Concept Development to Product Realisation. Triple Layered Cryogenic Tanks with Internal Heat Exchanger. R&D Project | May 2010 |
Static Cryogenic Storage Tanks | BOC, Air Liquide, Coregas, SSJV, Coffs Harbour and Various customers | Over 60 off, ranging from 3,000L to 300,000L, and 17bar to 35bar. LIN / LOX / LAR / CO2 / LNG. | On-going |
Repairs / Refurbishment | Various customers | Road tankers, ISO containers and storage tanks | On-going |
ISO Containers, Full Stainless Steel | BOC Air Liquide & Others Customers | CSC / IMDG / ADR / RID / TIR / UN Approved for International Transportation of Dangerous Goods. More than 30 ISO Containers, 20,000L @ 23bar. | Jan 2010 |
CO2, WA | BOC / CP Mining | 1 off 215,000L @ 23bar Horizontal CO2 Storage Tank. | Jun 2010 |
Micro LNG Plant Tasmania and Queensland | BOC | 2 off 300,000L @ 7bar, Vertical LNG Tanks, 30m tall. Seismic / Wind Reinforced. 6 off 80,000L Vertical LNG Tanks. 2 off 300,000L (Repeat Order for QLD). | Mar 2010 Mar 2010 Feb 2011 |
Pluto LNG, WA | BOC / Woodside | 3 off 185,000L @ 9bar, Horizontal Liquid Nitrogen (LIN) Storage Tanks. | Dec 2009 |