Cryeng Group has completed the design and manufacture of Ethylene ISO shipping containers for GLNG plant project. It is compliance with AS1210, AS3961, AS3711, ADR, ADG and IMDG through all stages of design, installation testing and adhere all site health, safety and environmental requirements. We performed analysis of allowable nozzle loads on transition plates. The finite element analysis is being carried out to include analysis of the pipework loads.
Back to Project